The Colour Group - Factory Operations Blueprint Portal
Operational Vision Portal v3.6 • Brick Factory ERP Architecture

THE COLOUR GROUP — FACTORY OPERATIONS BLUEPRINT

🎯 Future Operational Vision

Welcome! This blueprint represents the **future operational model** for The Colour Group, built around Brick Factory ERP as our central intelligence platform.

🧭 How to Explore This Blueprint

  • • Click Departments below to expand dedicated workflows.
  • • Hover over purple automation nodes for sample JSON payloads.
  • • Toggle Developer Mode (top right) to inspect backend schemas.

🤝 Collaborative Discussion

This specification is a **living conversation starter**. We actively welcome feedback, improvements, and alternative ideas from the software development team to build the best platform together.

💻 DEVELOPER ARCHITECTURE: RELATIONAL SCHEMA & STATE MACHINE FOR SOFTWARE TEAM
1. RELATIONAL DATA HIERARCHY (ONE-TO-MANY)
• MasterOrder (order_id: "CT-10542")
└─► ShipmentGroup (shipment_group: "A", status: "IN_PROD")
└─► ProductionTraveller (traveller_id: "CT-10542-A-01")
2. TRAVELLER STATE MACHINE LIFECYCLE
1. CREATED ──► Generated at RIP hot-folder / PO intake
2. PRINTED ──► 570mm strip printed at end of manufacturing run
3. STAGED ──► 🟢 Scanned at exit ──► ERP assigns STAGING-BIN-A07
4. DISPATCHED ──► 🟣 Group scanned at pack table ──► Courier API label
⚡ MASTER MANUFACTURING LEAD TIME CONFIGURATION MATRIX ERP PARTIAL DISPATCH THRESHOLD: ≥ 24 HOURS (1 DAY)
FAST-TRACK CELL (SAME-DAY CUTOFF 12:00 PM)
  • • DTF Transfers (Roll/Cut): Same Day (< 12pm) [lead_time_hrs: 0]
  • • UV DTF Transfers: Same Day (< 12pm) [lead_time_hrs: 0]
  • • Vinyl Decals (Standard): Same Day (< 12pm) [lead_time_hrs: 0]
  • • Sublimation Rolls: Same Day (< 12pm) [lead_time_hrs: 0]
MID-TIER CELL (24 HOURS – 5 DAYS)
  • • Laminated Decals: +1 Day (Cold Roll) [lead_time_hrs: 24]
  • • UV TPU Patches: 48 Hours [lead_time_hrs: 48]
  • • Sublimated Goods: 3–5 Days [lead_time_hrs: 96]
  • • Screen Transfers (Outsourced): 4–5 Days [lead_time_hrs: 120]
EXTENDED MANUFACTURING CELL (3–7 DAYS)
  • • In-House Garments: 3–5 Days [lead_time_hrs: 96]
  • • Supplier-Ordered Garments: 5–7 Days [lead_time_hrs: 144]
  • • Multi-Position Garments: 5–7 Days [lead_time_hrs: 144]

📄 Production Traveller Standard (570mm Roll-Fed Strip with Lead-Time Due Date)

Zero-box lean print layout. Black ink only on substrate (No white backing). Height: 32mm.

LEAN INDUSTRIAL STANDARD
MASTER: CT-10542 GROUP: A
ACME WORKWEAR DPD NEXT DAY
GROUP MATRIX:
[A-01] A-02 | B-01 B-02
DEPT: DTF TRANSFERS MACH: DTF-02
SPEC: 500mm x 3.2m Gang Sheet (Matte Film)
QTY: 1 ROLL PACK: Tube + End Caps
STAGING TARGET: BIN-A07
DUE: TODAY (SAME DAY)
PRIORITY: EXPRESS PARTIAL QC: [   ]
*CT-10542-A-01*
CT-10542-A-01
LIVE ERP
1. Order Intake & Intelligent Checkout Evaluation
Shopify Store
Brick Factory Portal
Sales / Phone
Trade Account
API Order
CHECKOUT LEAD-TIME EVALUATOR: Do Basket Lead Times Delta ≥ 24 Hours (1 Day)?
YES ──► OFFER EXPRESS PARTIAL DISPATCH
e.g., DTF Roll (Same-Day) vs Garments (5-7 Days). Offer Express Partial Dispatch at checkout.
NO ──► STANDARD SINGLE SHIPMENT
All products share similar lead times. Route under single Shipment Group A.
Master Order Decomposition (e.g., CT-10542) [POST /api/v1/orders/decompose]
Decomposes into Group A (`A-01 Same-Day`) & Group B (`B-01 5-7 Days`)
Are Artwork Files & Specifications Valid?
YES ──► Select Department NO ──► Hold & Sync CS
🔴 Contact Customer (CS Portal Alert)
Receive Revised File ──► Re-flight
2. Department Production Workflows (Click Tabs To Explore)
👇 Click any tab to switch view
DEPARTMENT 1: DTF TRANSFERS (SAME DAY IF ORDERED BEFORE 12:00 PM)
Artwork Pre-flight Check ──► Queue Job in Digital Factory RIP
Select DTF Production Queue
STANDARD COLOUR QUEUE (Printers 1, 2 & 3)
WHITE / METALLIC QUEUE (Printers 4 & 5)
Main 9-Colour Production Printers
White-Only / Gold Metallic / Silver Metallic Film
⚙️ DTF PRODUCTION CELL (CONTINUOUS AUTOMATED PROCESS)
1. DTF Printer Pass
2. Powder Application
3. Tunnel Oven Cure
📄 INLINE PRODUCTION TRAVELLER STRIP: Printed at END OF JOB (Group ID: CT-10542-A-01)
🟢 PRODUCTION SCAN: Operator Scans Sub-Task Traveller Barcode (`CT-10542-A-01`) ──► ERP Status: "Production Complete / Moved to Finishing"
What Product Was Ordered?
ROLL PRODUCT
CUT PRODUCT
Metres / Half Metres / Quarter Metres / Full Roll
Individual Sheets or Precision Cut Transfers
ROLL PRODUCT FINISHING
Measure Roll Length
Re-roll Product (Attach Production Traveller Strip to Outer Roll)
Route to Group Staging Bay ──►
CUT PRODUCT FINISHING METHOD
Large Volume Run?
YES ──► Slicer NO ──► Flatbed
✂️ Semi-Auto Slicer
Set Vertical Blades
Program Cut Length
Auto Feed & Chop
Basket Collection
📐 Flatbed Cutter 1 / 2
Scan Optical Marks
Auto Precision Cut
Individual Pieces
🔍 Quality Check Inspection Pass?
YES ──► Attach Production Traveller Strip & Route to Group Staging Bay NO ──► Log Scrap Reason & Trigger Sub-Task Reprint
🟢 STAGING SCAN: Scan Traveller Barcode at Production Staging ──► ERP Assigns Group A Bin (`STAGING-BIN-A07`)
DEPARTMENT 2: UV DTF TRANSFERS (SAME DAY IF ORDERED BEFORE 12:00 PM)
Artwork Check (Spot White & Gloss Varnish Layers)
🖨️ UV DTF Roll Printer (Single Pass: CMYK + White + Gloss Varnish)
Continuous Inline A/B Film Laminator (Prints Production Traveller Strip `A-02` at End of Run)
🟢 PRODUCTION SCAN: Operator Scans Traveller Barcode (`CT-10542-A-02`)
Sheet Trim & Manual Cut-Down Separations
🔍 Quality Check ──► Board Sleeve Pack ──► Route to Group A Staging Bay (`BIN-A07`)
DEPARTMENT 3: VINYL DECALS (SAME DAY < 12PM / LAMINATED +1 DAY)
Artwork & Cut Vector Line Check
🖨️ Large Format Print-and-Cut Roll Printer (Prints Production Traveller Strip at End of Run)
Require Laminate?
YES ──► Cold Roll Laminator (+1 Day Curing) NO ──► Skip Lamination
✂️ Graphtec Plotter Cutter (Optical Registration Mark Scan)
Cut Format Type?
KISS CUT ──► Cut Vinyl Layer Only ──► Weed Excess Vinyl DIE CUT ──► Cut Through Vinyl + Backing Paper
🔍 Quality Check & Count ──► Pack Decals (Attach Traveller) ──► Route to Group Staging Bay
DEPARTMENT 4: UV TPU / RAISED PATCHES (48 HOURS PRODUCTION)
Manual Artwork Check ──► Prepare Base & Raised Texture Layers
🖨️ Print Directly onto Thick TPU Media (Prints Production Traveller Strip at End of Run)
Inline UV LED Cure Engine
📐 Flatbed Cutter (Cut Out Patch Outline Shapes)
🔍 Quality Check ──► Pack Patches (Attach Traveller Strip) ──► Route to Group Staging Bay
DEPARTMENT 5: DECORATED GARMENTS (IN-HOUSE 3-5 DAYS / SUPPLIER 5-7 DAYS)
LANE A: STOCK TASK
Stock In-House?
YES (3-5 Days) ──► Pick Shelf NO (5-7 Days) ──► Order Supplier
Receive Delivery ──► Check QC ──► Allocate Garments into Labelled Job Tote (`TOTE-882`)
LANE B: DECORATION TASK
Method Required?
DTF TRANSFERS EMBROIDERY
DTF: Print Cell & Cut Transfers (Production Traveller Attached)
Embroidery: Digitise File ──► Frame ──► Stitch Machine
MATCHING / STAGING VALIDATION SCAN
🔵 VALIDATION SCAN: Scan Tote Barcode + Scan Production Traveller Barcode
VALIDATION MATCH ──► Unlock Heat Press Screen MISMATCH ──► LOCK TASK & Flag CS Holding Bay
🔥 Heat Press First Position (e.g. Left Chest) ──► Scan Position Complete
Another Position / Method Required? (e.g. Back Print)
YES ──► Press / Stitch Next Position NO ──► Move to Final Garment QC
🔍 Final Garment QC ──► Fold ──► Bag ──► Attach Production Traveller Strip (`CT-10542-B-01`)
DEPARTMENT 6: SUBLIMATION (PAPER ROLLS SAME DAY < 12PM / GOODS 3-5 DAYS)
What Product Type Was Ordered?
SUBLIMATION TRANSFERS ONLY (SAME DAY < 12PM)
SUBLIMATED GOODS (Mugs/Mats: 3-5 Days)
Sold Exclusively as Roll Product (1/4m, 1/2m, 1m Gang Sheets)
Requires Blank Substrate Stock + Precision Paper Wrap Trimming
OPTION A: ROLL TRANSFERS ONLY
Artwork & Colour Profile Verification
🖨️ Print onto Sublimation Transfer Paper Roll (Prints Production Traveller Strip at End)
🟢 PRODUCTION SCAN: Scan Production Traveller Barcode
Measure Roll Length (1/4m, 1/2m, 1m Gang Sheet)
Re-roll Product (Attach Traveller Strip to Roll)
Quality Check ──► Roll Wrap Pack
Route to Group Staging Bay ──►
OPTION B: SUBLIMATED GOODS WORKFLOW
BLANK STOCK TASK
Pick Blank Items (Mugs, Tumblers, Mats)
Allocate Stock into Job Tote (Bin Tagged)
PAPER WRAP TASK
🖨️ Print Sublimation Paper Roll
📐 DTF Flatbed Cutter (Trim Wraps + Traveller)
MATCHING STAGING STATION
🔵 VALIDATION SCAN: Scan Tote Barcode + Scan Production Traveller Barcode
Wrap & Tape Paper onto Item ──► Mug Press / Rotary Oven / Heat Press
Cooling Station ──► Final Inspection ──► Box Pack (Attach Traveller Strip)
🟢 STAGING SCAN: Route Output to Group Staging Bay (`STAGING-BIN`)
DEPARTMENT 7: SCREEN-PRINTED TRANSFERS (100% OUTSOURCED: 4-5 DAYS)
Create Supplier Purchase Order in Brick Factory ──► Send Approved Artwork & Specification
Await Supplier Production ──► Receive Delivery & Check Quantities
🟢 PRODUCTION SCAN: Receiving Inspection Complete (Production Traveller Strip Printed & Attached)
🔍 Final Quantity & Quality Check ──► Pack ──► Route to Group Staging Bay
3. Production Staging, Group Consolidation & Partial Dispatch Gateway
📦 GROUP CONSOLIDATION STAGING BAY (SHIPMENT GROUP A) LOCATION: STAGING-BIN-A07
Are all sub-task Production Travellers for SHIPMENT GROUP A present? (`A-01` + `A-02`)
YES ──► UNLOCK SHIPMENT GROUP A PACKING
All Group A components present. Release to Packing Table for immediate courier label generation.
NO ──► HOLD IN GROUP STAGING (`BIN-A07`)
Hold completed Group A outputs until remaining Group A travellers arrive. Group B stays in production.
🔵 GROUP CONSOLIDATION INTERLOCK SCAN: Scan ALL Group A Production Travellers (`CT-10542-A-01`, `CT-10542-A-02`)
Brick Factory validates Group A completeness and unlocks DPD/DHL label generation for Shipment Group A.
🟣 GROUP A DISPATCH READY SCAN: SCAN GROUP A TRAVELLERS AT PACKING TABLE
Brick Factory Automatically: Generates DPD/DHL Label for Group A ──► Syncs Group A Tracking Code to Shopify ──► Customer Email Issued ("Shipment 1 of 2 Dispatched")
ERP PARTIAL DISPATCH PAYLOAD:
POST /api/v1/orders/dispatch-group
{ "parent_order_id": "CT-10542", "shipment_group": "A", "scanned_travellers": ["CT-10542-A-01", "CT-10542-A-02"], "status": "PARTIALLY_DISPATCHED", "issue_carrier_label": true }
OPTION A: COURIER DELIVERY
1. Apply Courier Label (Generated at Group Dispatch Ready Scan)
2. Hand Off Box to Courier Pick Area
3. Group A Tracking Code Synced to Shopify Store
OPTION B: FACTORY PICKUP
1. Customer Receives Collection QR Email for Group A
2. Move Group A Box to Pickup Bay Slot
3. Scan QR Code at Counter Bay to Close Shipment Group